Minneapolis: Collapsing support beams close Webber Park Library until further notice
|
There’s nothing like thinking your building’s going to fall down, to fuel the passions of those advocating to get an entirely new one. And since it takes so much money to maintain a temporary facility, prepare to do without until the new one can be built. We’re talking about Webber Park Library; that’s an impression, not necessarily the final word.Early in July, several ceiling tiles fell down while patrons and staff webber librarywere in the facility. Gary Peterson said he was there, and saw the guy whose computer they fell on. The area is over the west bank of windows; the metal between the windows shows signs of stress, and there is a widening crack at a corner of the brick at the south end behind the window wall.The metal ceiling grid had buckled and snapped at that point where the wall was leaning in ever so slightly at the top, perhaps pushing out ever so slightly at the bottom and twisting on a poorly supported beam.Interior corner brick, separating.An engineer explained his best assessment during a tour with Hennepin County Commissioner Linda Higgins, a couple of Hennepin County library board members, assorted staff and community members July 18. Jerome Ryan, architectural section Leader for Hennepin County Property Services said he suspects that in a previous repair to the foundation under the window, “they probably did not repair under the corner,” an area that, while structural, cuts further into the library footprint and would not have been easily accessible. Continue Reading





